Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

On the Operation duration tab you can set time windows for different operations, like loading/unloading, drop/pickup.

Operation duration settings are split into three groups according to operation periods:

Beginning of the route:

  • Fixed loading duration is the fixed time for loading at the depot before the run start. The default value is 40 minutes.
  • Variable loading duration (per unit) is the time for loading of one unit at the depot before the run start. Can be set in minutes, hours, days and weeks.

During the route:

  • Fixed time per address is the additional time (in minutes) to get to a customer.
  • Fixed time per order is the fixed operation time for each order at a customer location. The default value is 20 minutes.
  • Variable duration per capacity unit delivery is the time for drop of one capacity unit at a customer location. Can be set in minutes, hours, days and weeks.
  • Variable duration per capacity unit collection is the time for pickup of one capacity unit at a customer location. Can be set in minutes, hours, days and weeks.

End of the route:

  • Fixed unloading duration is the fixed time for unloading at the depot after the run end. The default value is 20 minutes.
  • Variable unloading duration (per unit) is the time for unloading of one unit at the depot after the run end. Can be set in minutes, hours, days and weeks.



Related articles

Manage your operation durations

Scheduling configuration

  • No labels